Friday, January 20, 2012

Friday, Friday

Today was one of those days. The end of the week, very little work to do, and almost no progress evident. And so tensions were running high and there was much arguing. Stefan and Matt helped re-level the boat and finally lunch time arrived. It was decided by John (the boss) that the deck was fit well enough, and it was time to glue to the boat. We mixed goop in five gallon buckets and added filler to it. Blending this mixture with a 36 volt drill, we produced what looked like cake frosting. By packing this goop into cake bags, we proceeded to frost the sheer of the boat. I know have a backup career and its not boat building. We go in tomorrow to fillet the inside of the sheer and to tape the outside.

The kids at EB are coming over for dinner, and Stefan is making a five lb roast. He marinated it over night and is now baking it surrounded by potatoes and bacon. It smells wonderful in here.


No comments:

Post a Comment